Skip to main content
Tti Testing Laboratories Logo
Tti Testing Laboratories Logo
Tti Testing Laboratories Logo

Testing

Blog

Pre-Production Inspection: What to Check Before Cutting Starts

Pre-production inspection in Pakistan: what to check before cutting, four-point fabric grading, bulk fabric tests, and what the PPI report should carry.

A pre-production inspection (PPI) checks the bulk fabric, trims, approved samples and the factory's set-up before cutting starts. It is the cheapest point in an order to find a wrong fabric, an off shade or a missing specification: nothing has been cut yet, so a finding changes the materials instead of the goods.

In the Tti Inspections cycle, PPI comes before manufacturing begins, ahead of the initial production inspection at around 10 to 20% of production, DUPRO at 30 to 60% and the final inspection on packed goods.

Where PPI sits in the inspection cycle

Each visit answers a different question. The later the visit, the more of the order a finding has already touched (Tti Inspections):

Stage

When

Question it answers

Pre-production inspection (PPI)

Before manufacturing begins

Are the materials, samples and line ready for bulk?

Initial production inspection (IPI)

Around 10 to 20% of production

Is the first output right?

During production inspection (DUPRO)

Around 30 to 60% of production

Is the running lot drifting?

Pre-final inspection (PFI)

Around 60 to 80% of production

Are measurements, fit and packing on track?

Pre-shipment inspection (PSI)

100% packed

Is the shipment acceptable under AQL sampling?

Names differ between inspection bodies. QIMA folds its pre-production checks into an initial production check (IPC), run from before production begins up to 20% complete. Intertek describes its IPC as an inspection of raw materials and components before production starts. Whatever the name, write the timing into the booking: before cutting, with the bulk fabric and trims already in the factory.

What a pre-production inspection checks

At Tti Inspections, PPI covers pre-production sample approval, production line and QC readiness, and specification alignment (Tti Inspections). In practice that means comparing what is in the factory against what the buyer approved:

Check

Compared against

What it prevents

Bulk fabric: quantity, width, weight and construction

Purchase order and fabric specification

Cutting from the wrong or short fabric

Fabric defects, roll by roll

Agreed four-point limit

Faults cut into panels and found at the final

Bulk shade

Approved lab dip or shade reference

A whole colourway in the wrong shade

Trims and accessories

Approved trims card and bill of materials

Wrong zips, buttons or thread sewn into every piece

Pre-production sample

Buyer's approval and comments

Bulk built to an unapproved sample

Artwork, labels and tags

Approved files: spelling, fonts, size, position

Wrong care or size labels in every garment

Line, machines and QC staff

Production plan and quality plan

A line that starts before it can meet the spec

Packing materials and shipping marks

Packing instructions

Re-packing at the end of the order

QIMA's published pre-production checks follow the same lines: raw material quantities and storage conditions, colours, style and construction, artwork, main, care and size labels and tags, product dimensions, and unit, inner and outer packing with shipping marks (QIMA). Intertek's IPC verifies that the factory has ordered the correct materials, components and accessories to the buyer's specification (Intertek).

Fabric is graded with the four-point system

ASTM D5430 covers the visual inspection and grading of fabric; the current version is D5430-26. Its four-point option scores each defect by length, and a single defect carries no more than 4 points (V-Trust):

Defect length

Penalty points

Up to 3 in (75 mm)

1

Over 3 to 6 in (75 to 150 mm)

2

Over 6 to 9 in (150 to 230 mm)

3

Over 9 in (230 mm)

4

Points per 100 square yards = total points × 36 × 100 ÷ (width in inches × length in yards). Worked example: a 100-yard roll, 60 inches wide, with 24 points scores 24 × 3,600 ÷ (60 × 100) = 14.4 points per 100 square yards.

The standard sets the method, not the pass mark. Buyers set their own limit; some factories accept up to 40 points per 100 square yards (V-Trust). ASTM warns that results can vary considerably between its point-assignment options, so buyer and supplier should agree the option as well as the limit (ASTM). PPI is the right time to grade: a roll over the limit can still be replaced, while a defect found after cutting is already inside a panel.

Test the bulk fabric before it is cut

Approval of a lab dip or a sample yardage does not prove the bulk lot behaves the same way. Shrinkage, weight and colour fastness are lot properties, and the PPI is the last point where a failed result changes the fabric, not the garments. Methods on the Tti Labs ISO/IEC 17025 scope (PNAC LAB-022) include:

Property

Why test before cutting

Methods on the Tti Labs scope

Mass per unit area (weight)

Confirms the bulk matches the ordered weight

ISO 3801:1977, ASTM D3776/D3776M-20(2025), BS EN 12127:1998

Dimensional change after washing

Lets the pattern allow for shrinkage before markers are made

ISO 6330:2021 with ISO 5077:2008; AATCC TM135:2025, AATCC TM150:2025

Spirality and skew

Twisted side seams cannot be fixed after sewing

ISO 16322-1:2005, -2:2021, -3:2021; AATCC TM179-2025

Colour fastness to washing, rubbing and perspiration

A failing dye lot can be re-dyed or replaced

ISO 105-C06:2010, ISO 105-X12:2016, ISO 105-E04:2013

Tensile and tear strength

Weak fabric fails in seams and at stress points

ISO 13934-1:2013, ISO 13937-1:2000

Pilling

Surface wear shows after the first washes

ISO 12945-1:2020, ISO 12945-2:2020

The denim quality control guide covers shrinkage on denim in detail, and the lab testing guide covers how to plan a test programme for an export order.

Worked example: a shade problem caught before cutting

An order of 8,000 knitted polo shirts in four colours, 2,000 per colour. The buyer's minimum is grade 4 on the grey scale for change in colour (ISO 105-A02), on which 5 means no visible difference. At the PPI, the inspector compares each bulk lot with the approved lab dip and rates the navy lot 3-4.

  • At the PPI: the navy fabric is held. The mill re-dyes or replaces it, and the other three colours are released for cutting. No navy panel has been cut.

  • Found at DUPRO instead: part of the navy order is already cut and sewn. The made pieces need sorting, and the rest needs new fabric.

  • Found at the final: all 2,000 navy shirts are made and packed in the wrong shade, and the lot either fails or ships with the fault.

This example is worked from the grey-scale grades, not from a real inspection result.

PPI, IPC and DUPRO compared


PPI

IPI or IPC

DUPRO

Timing

Before cutting

First 10 to 20% of output

Around 30 to 60% of production

Looks at

Materials, samples, specifications, line set-up

First finished pieces

The running lot

A finding changes

The materials

The first pieces and the process

The rest of the run

Cost of a finding

Replace or correct inputs

Rework a small quantity

Sort made pieces, correct the line

A PPI does not replace any later visit. The DUPRO guide covers the mid-run check, the AQL inspection guide covers sample sizes and limits, the pre-shipment inspection guide covers the final, and the container loading supervision guide covers the last check before the seal.

Checklist: what to send before a PPI

  • Purchase order with quantities by style, colour and size, and the planned cutting date

  • Approved pre-production sample, or photos of it, with the buyer's comments

  • Spec sheet with measurement points and tolerances

  • Fabric specification: construction, width, weight, the four-point option and the points limit

  • Approved lab dips or shade references, with the accepted grey-scale grade

  • Trims card and bill of materials

  • Artwork, label and tag files

  • Test requirements for the bulk fabric, with the methods and limits

  • Packing instructions and shipping marks

  • Factory address and every unit approved to work on the order

Checklist: what the PPI report should carry

  • Fabric and trims in the factory against the quantities required

  • Rolls inspected, points per 100 square yards for each, and rolls over the limit

  • Shade grades for each bulk lot against the approved reference

  • Pre-production sample status and any open comments

  • Deviations from the specification, artwork or labels

  • Line, machine and QC readiness

  • Photographs of each finding

  • Corrective actions agreed, with dates, and a clear go or hold for cutting

How Tti Inspections runs a PPI

Tti Inspections Pvt Ltd is accredited to ISO/IEC 17020:2012 under PNAC IB-006, valid until 12 Sep 2027 and listed on the PNAC active register. The accredited textile scope names ASTM D5430 for fabrics, ISO 2859-5 for garments and ANSI Z1.4-2008. The cycle runs sample picking, pre-production inspection, initial production inspection, DUPRO, pre-final inspection, final random inspection, full check and loading supervision (Tti Inspections).

Booking is within 24 hours, and the report follows within the next 24 hours after the inspection is complete. Where the PPI needs lab evidence on the bulk fabric, Tti Labs testing under ISO/IEC 17025 accreditation LAB-022 can test it before cutting.

Book a pre-production inspection

FAQ

What is a pre-production inspection?

An on-site check before cutting starts. The inspector compares the bulk fabric, trims, labels, approved samples and the factory's line set-up with the buyer's order and specification, so problems are fixed in the materials, not in finished goods.

When should a pre-production inspection be done?

Before bulk cutting, once the bulk fabric and trims are in the factory. In the Tti Inspections cycle it comes before manufacturing begins, ahead of the initial production inspection at around 10 to 20% of production.

What is the difference between a PPI and an IPC?

A PPI looks at materials and set-up before production. An initial production check (IPC) usually also covers the first output: QIMA runs its IPC from before production up to 20% complete.

How is fabric graded at a PPI?

With the ASTM D5430 four-point system. Each defect scores 1 to 4 points by length, and the total is converted to points per 100 square yards. The buyer sets the limit; some factories accept up to 40.

Does a PPI replace the final inspection?

No. A PPI checks inputs before production. The pre-shipment inspection gives the pass or fail on the packed lot under AQL sampling. Book both, and a DUPRO in between for larger orders.

References

  1. Inspection services, softlines inspection stages and turnaround, Tti Inspections, https://www.ttilabs.net/inspection

  2. Initial Production Check (IPC): from before production begins up to 20% complete; raw material, specification and packing checks, QIMA, https://qima.com/initial-production-check

  3. Initial Production Check (IPC): raw materials and components inspected prior to production, Intertek, https://intertek.com/government/ipc

  4. ASTM D5430-26, Standard Test Methods for Visually Inspecting and Grading Fabrics, ASTM International, https://store.astm.org/d5430-26.html

  5. ASTM D5430 four-point system: points by defect length, V-Trust, https://www.v-trust.com/en/our-services/inspection-standards/other-reference-standards

  6. Understanding the 4-point system for fabric inspections: per-100-square-yards formula and acceptable level, V-Trust, https://www.v-trust.com/en/blog/understanding-the-4-point-system-for-fabric-inspections

  7. ISO 105-A02, Textiles, Tests for colour fastness, Part A02: Grey scale for assessing change in colour, International Organization for Standardization, https://www.iso.org/standard/3785.html

  8. Accreditation No: IB-006 (Tti Inspections Pvt Ltd; ISO/IEC 17020:2012; textile scope ASTM D5430, ISO 2859-5, ANSI Z1.4-2008; valid until 12-09-2027), Pakistan National Accreditation Council, https://pnac.gov.pk/pdfFiles/IB-006

  9. Active inspection bodies register, Pakistan National Accreditation Council, https://www.pnac.gov.pk/index.php/Accredited-Cabs-serve/Inspection-Bodies/Active

  10. Accreditation No: LAB 022 (Tti Testing Laboratories; ISO/IEC 17025:2017; valid until 08-08-2027), Pakistan National Accreditation Council, https://pnac.gov.pk/pdfFiles/LAB-022

  11. Laboratory testing services, Tti Labs, https://www.ttilabs.net/testing

Recommended reading

ISO/IEC 17025 ACCREDITED

Testing, inspection and certification for Pakistani exports.

Keep Reading

More insights on testing, compliance, and sustainability from Tti Labs

General

Fabric shrinkage testing explained: ISO 5077, ISO 6330 and AATCC 135 and 150, how the percentage is calculated, spirality, and how to set the limit.

General

What the EU GPSR asks of Pakistani exporters: the EU responsible person, labels, technical documentation, online listings, and the tests that back them.

General

How thread count and towel GSM are tested: ASTM D3775 and ISO 7211-2 counts, why plied yarns count once, GSM by ASTM D3776, and the clause to write.